제주대학교 Repository

풍력발전단지의 출력변동 완화를 위한 BESS 용량 산정

Metadata Downloads
Alternative Title
Estimation of BESS Capacity for Mitigating the Fluctuation of Wind Power Generation Output
Abstract
This paper presents the estimation of capacity of BESS(Battery Energy Storage System) equipped for mitigating the fluctuation of wind power generation output in Jeju island. For the analysis, two sited wind farms located in the east and west side of Jeju island are selected, and also lithium-ion type battery is adopted. To choice the optimum battery capacity, power system stability of Jeju island and output analysis of two wind farms which are HaengWon and HanKeong wind farms located in the east and west side of Jeju island are considered.
To analyze the output characteristics of the proposed control scheme, two kinds of simulations are carried out by using the PSCAD/EMTDC program. One is the steady state operation under the variable speed wind, and the other is that all of wind farms in Hankyung or Haengwon wind farm shut down instantly under the rated power output.
With the comparison of these results, it is useful for analyzing and mitigating the fluctuation of wind power generation output with BESS.
Author(s)
김영길
Issued Date
2012
Awarded Date
2012. 8
Type
Dissertation
URI
http://dcoll.jejunu.ac.kr/jsp/common/DcLoOrgPer.jsp?sItemId=000000005961
Alternative Author(s)
Kim, Young-Gil Kim
Affiliation
제주대학교
Department
산업대학원 전기공학과
Advisor
김일환
Table Of Contents
그림 목차 ii
표 목차 ⅲ
SUMMARY ⅳ

Ⅰ. 서 론 1


Ⅱ. 제주지역 풍력발전단지의 출력 특성 3

2.1. 행원풍력발전단지의 출력 특성 3
2.2. 한경풍력발전단지의 출력 특성 6


Ⅲ. BESS 용량 산정 9

3.1. 남제주화력발전소 증․감발 기준 9
3.2. 풍력발전단지 출력 기준 9


Ⅳ. 컴퓨터 해석 및 고찰 14

4.1. 제어시스템 모델링 14
4.2. 해석 결과 및 고찰 19


Ⅴ. 결 론 24

참 고 문 헌 25
Degree
Master
Publisher
제주대학교 산업대학원
Citation
김영길. (2012). 풍력발전단지의 출력변동 완화를 위한 BESS 용량 산정
Appears in Collections:
Graduate School of Industry > Electrical Engineering
공개 및 라이선스
  • 공개 구분공개
파일 목록

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.